Channel Tunnel Rail Link

The Channel Tunnel Rail Link (CTRL) is the high speed (up to 186mph or 300km/h) rail link which connects the Channel Tunnel and subsequently continental Europe with Waterloo Station in London.

Hargreaves supplied installed HVAC systems for service shafts and portla buildings in this £1.9bn project which was completed and opened for use in 2007.

Channel Tunnel Rail Link (CTRL) case study
back